• Venture Capital Bank (Bahrain 2007)

    VCB commissioned LA to act as Client Representative on their behalf for the design and fitout of their new corporate offices on levels 6-8 of Park Plaza Building in the Diplomatic Area. The work included development of the design brief, budget, programme and scope of works, as well as directing and administering the design and fitout process under a Design/Build form of contract developed specifically for the project.

    The project comprises executive offices and Board Room on the 8th floor, including provision of raised flooring and a mezzanine level overlooking a landscaped atrium, landscaping of external roof terraces, administrative offices on the 7th floor and a business centre on the 6th floor. Quality of finishes ranges from extremely high to high office standard, with extensive I/T installations and full staff amenities.

    Venture Capital Meeting Room
    Meeting Room
    Venture Capital Library
    Library, 7th Floor
    Venture Capital Director's Office
    Director's Office
    Venture Capital Reception Area
    Reception Area

     

    Back to top

  • Prime Instant Offices (Bahrain 2007)

    In 2006, Prime Instant Offices took over the premises formerly fitted out for ANZ Bank on the 14th Floor of Al Jasrah Tower, and converted them into a sumptuous suite of serviced offices. With a proven demand for the faculties, we were commissioned to manage the fitout of a satellite office on the 10th floor, maintaining the same design theme and with interconnectivity of I/T and data systems.

    Seven offices, accommodating up to 24 people, plus a conference room, reception area, kitchenette, WC with lobby, a galley kitchen and office services zone were fitted into an area of just 148 m².

    Prime Instant Offices Reception
    Reception Area
    Prime Instant Offices Reception
    Reception Area
    Prime Instant Offices Reception
    Hall
    Prime Instant Offices Reception
    Desk Space
    Prime Instant Offices Reception
    Desk Space

     

    Back to top

  • Prysmian Offices - Al Zamil Tower (Bahrain 2007)

    Starting from a shell and core in a new building, designs were developed which took full advantage of sweeping views and an abundance of light to develop a contemporary office with uniquely detailed glazed walls, taking just 6 weeks to transform an awkwardly shaped space into a showpiece office shared by two organisations seeking to make an impression with their Middle East headquarters.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Bahrain Financial Harbour (Bahrain 2007 - 2008)

    Prior to the official opening of the Bahrain Financial Harbour in May 2007, we were engaged to establish the principles of measurement, verification of as built areas and standards of preparation for demise drawings for the two towers and podium shopping level of the Bahrain Financial Harbour. We have an ongoing role in this task.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Big Yellow Self Storage (Dubai 2007)

    Due to open in 2008, Big Yellow are constructing the world's largest, purpose-built self storage facility in the Industrial Media Production Zone, Dubai. Langmead Associates have been appointed as Owner's Representative to manage the implementation of the project, due to commence operations in 2008.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Jumeirah Beach Residence (Dubai 2003 - 2007)

    In July 2003, we were appointed by Arif & Bintoak for secondment as Project Director of the Jumeirah Beach Residences, Sector 4, in Dubai. The overall development is for 38 high-rise residential towers on a coastal site 1.7km long overlooking the Jumeirah lagoons. Sector 4 has a total of 8 towers, up to 52 storeys with 1,450 apartments totalling 430,000 m² and a $US300m budget.

    JBR
    Jumeirah Beach Residence
    JBR
    Jumeirah Beach Residence
    JBR
    JBR Floorplan

     

    Back to top

  • GBM Office Fitout (Bahrain 2006)

    GBM/IBM commissioned LA to relocate their offices to the 5th Floor of the MS Centre in Seef Area, Bahrain. The two divisions share a floor space of over 900 m² with shared Reception and Conference. The offices include state of the art I/T installations and incorporate two training rooms, a Parts Centre and Repair facility. With Design Consultants, Doha, we were instrumental in arranging the design and implementation of GBM's county office in Qatar in 2003.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • HSBC Office Relocation (Dubai 2005)

    Working in association with Arif & Bintoak, we provided project coordination and contract administration for renovation and refurbishment of more than 2,000 m2 of office space on 2 levels for relocation of a service department of HSBC Bank in offices facing Shaikh Zayed Road, as part of an ongoing relocation strategy. Phase II of the strategy involved relocation of the Bank's Business Development Unit at Enoc House in Dubai, completed October 2005.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Phillip Morris Office Fitout (Bahrain 2005)

    Phillip Morris engaged LA for the establishment of their representative office in Bahrain. The fitout from the original shell and core condition was carried out under tight restraints of time and cost,incorporating executive offices, a conference room, corporate reception and open plan office area. Existing bathroom facilities were modified and a staff amenity area is provided.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Bahrain Formula 1 Race Track (Bahrain 2004)

    In February 2004, we were appointed by Cebarco to administer and coordinate the final few months of interiors completion and fitout of the purpose-built Bahrain Formula 1 Racetrack in time for the first Middle East Formula 1 Grand Prix in April 2004.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Baker Hughes Office Fitout (Bahrain 2003)

    Lease negotiation, project coordination and contract administration for fitout of new office premises on the 1st floor of the landmark Citibank House in the Seef District of Bahrain. Baker Hughes required a high quality fitout, combining training facilities with a high tech office environment for their oilfield support and scientific analysis operations.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • DHL Saudi Arabia Development Programme (Saudi Arabia 2002)

    In early 2002, LA were appointed to prepare a development brief for an ambitious 3-year redevelopment programme of DHL facilities in the Kingdom of Saudi Arabia. The programme encompassed relocation of the country offices from Dhahran to a purpose built headquarters building in Riyadh, combination of the regional offices and distribution centre in Jeddah, a gateway facility at Riyadh airport and an upgrade of more than 50 express centres throughout the Kingdom.

    The project required preparation of a comprehensive development brief, budget plans, facility sizing, site identification and commissioning of schematic design proposals for the major buildings. Standardisation of express centre design was also developed, with prototype fitouts being completed in extensions of the existing Dhahran Country Office and express centre renovations in Nejran and the Aramco Al Mujamma Express Centre.

    DHL Saudi Arabia
    DHL Saudi Arabia
    DHL Saudi Arabia
    DHL Saudi Arabia
    DHL Saudi Arabia
    DHL Saudi Arabia

     

    Back to top

  • Capital Union Bank Fitout (Bahrain 2002)

    Project coordination and support for fitout of new Bank premises on the 11th floor of the Al Jasrah Tower in the Diplomatic Quarter. Reception, offices, conference room and support facilities.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Turkiye Is Bankasi Bank Fitout (Bahrain 2001)

    Project coordination and support for fitout of new Bank premises on the 8th floor of the Al Jasrah Tower in the Diplomatic Quarter. Reception, offices, meeting room and dealing room and support facilities.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • ANZ Investment Bank (Bahrain 2001)

    Project coordination and support for fitout of new Bank premises on the 14th floor of the Al Jasrah Tower in the Diplomatic Quarter. Reception, offices, high quality board room and support facilities in keeping with the Bank's corporate guidelines.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Coca Cola Middle East Office Modification (Beirut 2001)

    Study and report on feasibility of relocating CCNE operations into CCBCL Bottling Plant administration area in Chouefait. Study of options and alternative locations. Project coordination and contract administration of modifications to existing offices.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Coca Cola Middle East - Unitag House Phase I & II (Bahrain 2000 - 2002)

    A very compressed time scale for relocation and expansion of the former Coca-Cola Gulf offices, appointed as contract administrator after the commencement of work. Three floors fully fitted out and completed in stages for a phased move-in which began within two months of contract commencement. The fitout incorporates a highly sophisticated board room with full media wall and video conference facilities, a dedicated computer room with extensive I/T infrastructure and high quality, custom-made cabinetry and filing systems.

    Extension of offices in Unitag House were also undertaken to incorporate the remainder of the first floor, plus modifications to other areas to accommodate restructuring & additional staff. Renovation of common areas of the building on occupied floors.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Lawson Stathan Office Fitout (Bahrain 2000)

    Project coordination and support for fitout of new bank premises on the 9th floor of the Sheraton Complex. A contemporary, open-plan office layout with purpose made furniture, serpentine seating arrangement, aquarium and "feng shui" environment.

    Coming Soon
    Images coming soon
    Coming Soon
    Images coming soon

     

    Back to top

  • Dubai Dhow Wharfage Project

    Project coordination and support for fitout of new bank premises on the 9th floor of the Sheraton Complex. A contemporary, open-plan office layout with purpose made furniture, serpentine seating arrangement, aquarium and "feng shui" environment.

    Dubai Dhow Wharfage Project
    Dubai Dhow Wharfage Project
    Dubai Dhow Wharfage Project
    Dubai Dhow Wharfage Project
    Dubai Dhow Wharfage Project
    Dubai Dhow Wharfage Project
    Dubai Dhow Wharfage Project
    Dubai Dhow Wharfage Project

     

    Back to top